Now I have an electric shower and light circuit in the bathroom and I’m just wondering how you should run the 4mm earth cable for the supplementary bonding?
Should I run one from the light to the hot/cold pipe and then to the radiator pipe (I was going to connect this next door in the cupboard to rad pipes)?
Then do I run a second cable from the shower to the hot/cold + rad pipe?
I’m assuming any cable I run should not be cut at any point but should be a continuous length until the final point?
This is prob a simple one for some one cheers in advance for any pointers.
Should I run one from the light to the hot/cold pipe and then to the radiator pipe (I was going to connect this next door in the cupboard to rad pipes)?
Then do I run a second cable from the shower to the hot/cold + rad pipe?
I’m assuming any cable I run should not be cut at any point but should be a continuous length until the final point?
This is prob a simple one for some one cheers in advance for any pointers.