Can anybody explain how I terminate the 25mm earth cable out of 25mm SWA into MET on a conventional cut-out.
The cut-out block is maxed out at about 10mm CSA cable??
(can put into isolator first but still needs CSA continuity does it not)
The cut-out block is maxed out at about 10mm CSA cable??
(can put into isolator first but still needs CSA continuity does it not)