Hi All,
Just finished building my downstairs toilet. The next step is to get the Floor tiled, get the suite in and box in all the pipes.
Only, i'm not sure exactly what order to do it all in, to get the best finish.
My plan was to get the floor tiled first, that way the suite can just sit straight on top, minimising the amount of cut tiles. But this would mean i'd have to drill through some of the tiles to box in the soil and waste pipe as we have solid floors.
Any ideas on how to best go about it?