Hello, were refitting our bathroom and are looking for advice.
What order to do things in. Any help would be good.
Im putting in the pipe work at the mo, but when that done we need to,
1. Fit a fitted WC and recessed hand basin.
2. Tile two walls.
3. Fit the bath.
4. Lay flooring.
I think the main point is do i lay the floor, then put the units/bath on top, or fit the units and floor around them. As i say im also fitting pipes under the floor, what if i ever need to get to them?
Many thanks.
What order to do things in. Any help would be good.
Im putting in the pipe work at the mo, but when that done we need to,
1. Fit a fitted WC and recessed hand basin.
2. Tile two walls.
3. Fit the bath.
4. Lay flooring.
I think the main point is do i lay the floor, then put the units/bath on top, or fit the units and floor around them. As i say im also fitting pipes under the floor, what if i ever need to get to them?