IMG_2163
Ok, next :)

On the left and right heating isolation valves, under the boiler, far left and far right. Remove the small pozi screws holding the black plastic levers to the spindle. Once removed, check that the flats of each spindle are inline with the flow of water, so fully open is flats running front to back.

This is to prove both valves are fully open.
 

Media information

Album
First Album
Added by
MisterFish
Date added
View count
526
Comment count
1
Rating
0.00 star(s) 0 ratings

Image metadata

Device
Canon Canon EOS 20D
Aperture
ƒ/4
Focal length
18.0 mm
Exposure time
1/60 second(s)
ISO
400
Flash
Auto, fired
Filename
IMG_2163.JPG
File size
1.1 MB
Date taken
Sat, 11 February 2017 12:02 PM
Dimensions
3504px x 2336px

Share this media

Back
Top