I was thinking a rodding access in the small stretch of pipe just under the brick column in the drawing, on the left just before the 90 degree bend - would you agree?
Hi,
Would anyone know if here attached toilet soil pipe run is ok - if the two bends around the brick column would allow for proper flow?
There is plenty of space for the vertical drop in the pipe (ie. enough to run 40:1)
Or, would it perhaps be better to use a flex pipe that would allow for...