Recent content by caseymojo

  1. C

    Render renewal and drying time before plastering inside wall

    RICHARD C...... The wall is solid, but wet, How long before it can be rendered ?.. obviously will have to wait till the external wall render is dry, and the inside walls have dryed out completely, is that right ??.
  2. C

    Render renewal and drying time before plastering inside wall

    Thanks for your help Richard, I need all the help I can get, so thanks again for you input......caseymojo....
  3. C

    Render renewal and drying time before plastering inside wall

    Thanks PrenticeBoy, much appreciate your help.
  4. C

    Render renewal and drying time before plastering inside wall

    So no internal plastering could be carried out until the render (external)and the wall (internal) were completely dry ??
  5. C

    Render renewal and drying time before plastering inside wall

    ====Was thinking of the recess each side of the fire, thinking of putting in a gas fire and put a liner down the chimney... Thanks for your help...
  6. C

    Render renewal and drying time before plastering inside wall

    Had cracked render on external wall...removed render back to brickwork, brickwork was wet, and also removed internal plaster which was very damp and crumbling, cut back one metre on inside walls till it was solid.......so once the outside wall is newly rendered with breathable render, how long...
Back
Top