Coming back to this..
My plan before putting down new flooring is to apply arditex DPM and then NA. I can’t bring the level up much, I have about 1cm to play with before the door wouldn’t be able to open.
So I plan to do a thin film as per instructions of DPM. then 3mm of NA. This is under...
I have a modern Baxi combi boiler in my hallway. When it fires up, it is loud. It has a cupboard built around it with a floor to ceiling door, and the frame/side panel made from MDF. this dulls the noise a little but not as much as I’d like.
Between the side of the boiler and then MDF side...
Good evening party people.
I’m replacing vinyl floor in a crappy extension. It was due to be installed tomorrow. Tonight I lifted the existing vinyl floor and found lots of mould in one corner, black and reddish. It doesn’t feel wet or damp. A cheap moisture meter suggests ‘borderline’ wet in...
Extra info - I’m finding that every 3 to 4 days the gurgling gets worse. The rad at the highest point then has a cold top and I can get about 4 seconds of air from it. After this it seems the whole system gets hotter.
Interestingly I haven’t had to add any extra water to the system to...
Yeah sure. I get that. It’s generally quite simple under there. I should have got better photos. Perhaps later I’ll get some and draw where the pipes run.
In this case I think it’s because getting a line of copper down the hallway would have needed a run of floorboards to come up and someone...
This might sound dumb but how would I check and confirm this? It’s all quite simple down there.
A rad can’t be plumbed the wrong way right, just one end would be in and one end would be out, and they could be different on each rad? Ie as long as a rad is attached to both hot and cold, not both...
My photos are awful but here is one of the busiest junction. It’s hard to show layout without a diagram of the whole system. This used to look tidier when it was smaller pipe, it seems busy now but it’s quite space constricted and without lifting more boards it’s hard to arrange it better...
Probably. I think the entire system was installed circa 2010. New boiler, new rads except one in 2019. Pipework running along the hallway changed in 2024. So most of the system is ‘new’.
In terms of design, it’s a three bed semi so there isn’t actually much pipework there! Pipes come out...
Here’s two videos of the rad noises. They can vary in frequency but this is what I’ll hear when either turning the system from cold, or turning off most rads except one.
https://photobucket.com/share/8bbeb06f-dc80-4850-8f06-50f26c667733