That was my first option, but there are issues with RCD time discrimination between the existing RCD and the new one in the cabin. See: //www.diynot.com/forums/electrics/one-outdoor-buried-supply-to-two-log-cabins.320411/#2373016#ixzz1sgd5ptdw
I have a registered electrician coming...
The tails are fully enclosed in the cavity wall, with only the cunsumer unit exposed. Plus the CU is in an upstairs cupboard with "tricky" access back downstairs again. The meter box is ideally positioned for running the cable.
I have a project where I need to split the existing tails between the meter and the consumer unit so that the tails also feed a switch / fuse to an outdoor building.
To separate the meter tails to supply the existing CU AND new switch/fuse I need to add a pair of Henley blocks. I have it in...
BAS - I know what you are getting at about the roof overhang. I've made sure that the nearest part of the cabin (the roof) will be over 2m from any boundary. I would probably get away with 1m but there is another "trap" as well that a jobs-worth planner might take exception to. The overall...
I have two more questions about this installation.
To separate the meter tails to supply the existing CU and new switch/fuse I need to add a pair of Henley blocks. I have it in mind that these should be ok in my flush meter box if I tuck them away in one corner leaving space in case the DNO...
Thanks Chris.
I think I'll take your advice and get a registered electrician involved from the outset so that he can see what I'm doing right the way through. One of the main reasons I want to do the work myself is that it means climbing under the downstairs floor voids (tight fit but I've...
Thanks for the reply.
I am building two cabins because the total internal area I need is over 30m2 which would take it out of the "permitted development" category. Building two permitted development allows me to get around this. It would also be more expensive for one (very) large kit...
I am going to do the work myself and yes - I am am going to notify the work.
The workshop will have 2kw heater, lighting domestic power tools, radio etc. Nothing industrial!
The existing house CU is a non-split type with RCD protection of all MCBs - there are 2 spare positions...
My summer project is to build two large log cabins at the bottom of my garden. They are separated by a couple of metres. One is for use as a workshop / storage and the other for leisure / home office use.
I am planning on burying a 3 core 10mm2 SWA cable about 600mm under the mainly grass...