because it was a horrible gold ligh thing and i just want a plain rose wall thing so i can put a retro light cover thing on it. i have took a pic of the switches but we didnt touch those. will post in a min
and..... we cant remember how it was wired up either
hi we have been fitting a new ceiling rose. the sitting roomn has 1 light switch 3 switches and 3 lights. have 3 main wires each with the 3 colours except 1 which has a fourth wire (yellow) now we have wired it up with out the yellow wire and what happens is - when you switch light 1 on the ligh...
well i got incontact with NEDL £350 to move the meter.
i asked about the pme meter they gona charge me £40 for that and then she said my electrician would have to wire it up and put the wires to my radiators?
why would they put wires to my radiator?
thanks very much for the reply.
on the main elec feed is an northern electric sticker! should i get them or try and ring british gas who wont answer my phone calls lol
hi. long story short electrics were box'd in and now not.
i have pics
i need the mains electrics turned 90 degrees. who do i get? an elec or the elec board? my elec is through british gas. would they do this free or charge me?
also i no i need a new fuse box and i will get one asap...
the rads are old. had new boiler 6 months ago. new thermostats also.
the bath room rad doesnt get warm. the pipe is warm but no heat at all on the rad.
i tryd bleeding but it was full.
any ideas please?
we did our bathroom for 2k. thats use doing everything and his dad (sort of plumber) putting our new bath and bar shower and that in. this was knocking a wall down between toilet and bath as well.
as for the kitchen ours isnt 100% finished but i would say cost 4k. again we did it all...