Hi,
I want to run two 3/4" pipes from a hot press in the landing (back of the house) to two radiators at the front of the house.
I understand the joist holes should be made between 0.25 and 0.4 of the joist span.
The joist spans differ along the route where the stairs are. How should I deal...
Hi,
I want to run two 3/4" pipes from a hot press in the landing (back of the house) to two radiators at the front of the house.
I understand the joist holes should be made between 0.25 and 0.4 of the joist span.
The joist spans differ along the route where the stairs are. How should I...
Hi,
How difficult would it be to replace a section of steel heating pipe with copper? joining new copper pipe to steel pipe at a union?. I've attached a couple of pictures of the steel pipe unions.