Recent content by Engi

  1. E

    Path above DPC advise required

    Noseall many thanks for comments Do think the path is constructed correctly in relation to the DPC as I cannot see a DPC above the path. If the area of wall below the path is tanked would this be ok? Would be worth installing a drain channel at the edge of the path/wall to drain water to the...
  2. E

    Path above DPC advise required

    I've taken a photo of the path, it show the steps on one side of the extension. The max heigt of the steps is about 1.2m, the dark patch on the wall is where a gutter has been leaking. Appriciate any comments on the construction of the path
  3. Untitled

    Untitled

  4. path

    path

  5. E

    Path above DPC advise required

    Thanks for the replies. I have spoken to the vendor again and he is now saying that the area of the extension below ground level is tanked. He has agreed to meet me at the property to discuss what was carried out The extension is built of stone. Can anyone advise what questions I should ask...
  6. E

    Path above DPC advise required

    I am in the process of buying a house which has an extension. Around the extension there is a raised path which from what I can tell is approx 1.2 maximum above the DPC. I have asked the vendor (who is an NHBC builder who actually built the extension) about this and if the extension is tanked...
Back
Top