Recent content by firstbld

  1. F

    Relocating Drain inspection chamber

    I am doing a rear extension to our property which currently has an inspection cover 500 mm from the rear wall (extension will be 3 metres) and a sewer running parallel to the rear wall under the current patio 800mm from the rear wall. I have heard of a Thames Water requirement that there must...
Back
Top