Changed the thermostatic control valve today.
The moment I turned the shower on the reduced flow was evident.
It’s working perfectly.
Not a difficult job. These showers are quite modular and it’s all push fit internals.
I’ll give you that. Hence would rather replace with Mira if I had to. But just no right hand space to allow for a left entry shower which most Mira’s are (this is plumbed and wired to the right).
Fingers crossed I sort this one anyway
I’ve flow tested just now with shower head off. Couldn’t find my flow cup so timed into a bucket.
Power level 2
Min temperature 8 l/min
Max temperature 7 l/min
Sounds like this points back to the flow control valve I pasted in my original post. I’ve turned it stop to stop several times but...
I’ve just quoted what the product is sold as so everyone here knows the exact shower I have but thanks.
I always use the shower with no other water being drawn but unlike my Triton Topaz T100 before this I can easily flush the loo and this one would carry on running at a stable temperature.
As...
Hi
Triton T80 Easi-fit+ Thermostatic 10.5kW
My shower has gone from perfect to lukewarm overnight.
Both heating elements showing resistance, 10.4 Ohms and 12 Ohms
There’s some drop in flow between cold and hot but not huge. I honestly couldn’t tell you if less difference than when it was...
I’ve got a leak somewhere under the concrete floor in my open vented system and get air gurgling through when the hot water fires up as well as some trickling topping up into the header tank. With the heating system being about 40 years old I’ve decided to get it completely re plumbed in a few...
I see where you're both coming from.
I know for starters my current sockets and switches are at the wrong heights for current legislation and naturally if I did any of this work it would be to whatever measurements the electrician stipulated in order to certify it.
Will worry about that as and...
I'd definitely make sure we're both crystal clear as to what's included in the quote and what I'm doing.
Are you implying electricians don't like this type of arrangement in general?