hi
We have a new downstairs toilet fitted, it is connected to a new pipe under dining room running directly to main drain. Does anyone know what the grey pipe work is and why do we need it? I've never seen this in a downstairs lol before!
Thanks
Thanks woody, I expected a new roof to be free draining. Do building control not check the slope is adequate? It hasn't been signed off yet by building control, should I push them to highlight it?
Thanks woody, the builders were commissioned to built the single storey extension with a flat roof, the water puddles on that half for about 5 hours, the other side drains within an hour?
The level is running along the roof towards the guttering? The top of picture is towards the wall and the bottom towards the guttering if the makes sense!
Hi,
We have a new flat roof on our extension, approx 3m X 6m
When it rains it takes about 5 or 6 hours for one half to drain away, does this sound right for a new roof?
I went up with a spirit level and where the water sits it is perfectly level, I've taken a picture of the level in the...
Hi
Our builders are about to level the floors in our new extension but we are worried they have got the measurements wrong!
When the brickwork went up we raised the question and were told it was fine, as work progresses it looks worse. When the floor is levelled and laminate laid it is going...
Hi
We are having an extension built and the roof facias have just gone on. As you can see in the photo the side wall seems to dip in at the front suggesting the wall is not plumb. At the front the gap is about 2 inches between the facia and wall, this goes down to about 1 cm at the back...