The red line is the current proposed RSJ, with floor joists running at 90 to this, @ size of 225 X 75 @ 400 cts.
I am (+builder) thinking that putting the RSJ as per purple line is best, and then running joists (as above) at 90 to this which is as shown by the gree lines.
This would give...