It's possible I guess, if any of these foundations are the reason for the concrete is there any reason that it would project so far forward? Is there any reason I can't cut it back to the building line?
I had thought that a possibility, raft foundation, only thing that leaves me to think otherwise is that the slab doesn't project to the side walls of the property, nor to the neighbours, which is attached..
Thank you.
Was the path in line with the dpm on your property? It seems like the concrete is in line with the dpm at that level,it is also lower than the garage floor level which is the oddest thing..
Hi, bit of a querie here. Also first post so go easy on me! :-)
I'm just excavating to block pave my drive. However it seems the foundation project a lot further forward than the outside brickwork. Can I cut this and dig it away in line with the brick ready for hardcore etc??