3 years ago i had a garage built in cavity wall filled with rock wall.
coping stones were laid on top with a dpm cavity tray underneath.
since then i have built above removing the coping stones but left the dpm.
i have since noticed that the inside blockwork BELOW the dpm is very wet even to...