It has a table with a load of figures that do not mean much to me but the end bit says RCD operating times but there is no times for boiler or lights just times for ring cooker and shower
This is a link to item
http://www.qvsdirect.com/Excel-10-Way-Split-Load-Insulated-Consumer-Unit-C-w-Mainswitch-80A-30mA-RCD-6-MCBs-pr-22630.html
All the cables are in the wall
Just had a new consumer unit fitted it has 5 MCB and 1 RCD the electrician said it is 17th edition but someone has told me it should have 2 RCDs and the MCB should be split between them who is right.
Thanks for your replys would it be possible to put a tee to make 2 loops/zones from were the 22mm pipes ends so I could have one doing the front and one doing the rear of the house at the moment it runs all round the house and the pipes are all surface mounted doing it like this would hide most...
Can a 2 pipe central heating system be split into 2 loops the reason Im asking is at the moment it starts at 22mm then down to 15mm were it has 1 radiator come off then does the rest of the radiators.What i would like to know is if you can add more radiators to the first radiator.