Hi,
I'm having a single storey extention built 7m x 4m and because we are building over a 3m shared drain we are having a piled foundation.
The company we chose quoted for 6, 300mm augered pile cast insitu (£2975.00) and a 400 x 400mm RC ground beam 23m (£3925.00).
My problem is that due to...