so an update on the situation given by the BCO this is what they suggested.
In my existing kitchen i remove my current soil stack / vent and install a digo valve at 250mm from the floor.
In the garage they will accept a Y piece connection into a Slow 90 then straight up to the upstairs bathroom...
Do you think I might be able to get away with a slow 90 with rodding access in the bend? As it won’t be the main flow side as it will be at the top?
I have BcO coming today at 1pm. I’ve just measured and a 450 chamber physically won’t fit between my beams even on its side..
Thanks for the reply hugh, unfortunately I don’t think another option is available. A 450mm chamber could work I’d have to excavate more underneath the floor to get a larger chamber instead, I was hoping the smaller chamber would work but if I understand correctly you can’t put them more than...
I am doing an extension at the front of the kitchen which would make the svp that currently comes down in the kitchen be even further into the house. I need to run a new pipe for the kitchen utilities once the extension foundations have been placed.
This still doesnt help that much with the fact...
Hi All,
Wonder if you can help. I've taken on a home DIY project of adding a new bathroom in my house and planned on moving my down stack from upstairs. The big issue i have is the Cowboy of a builder who built my house never ran my soil pipe outside of my property it goes directly underneath...