Hi guys and girls
Trying to connect my new back to wall pan to waste!!
Glued or somehow fixed into my floor is what looks like a 90 deg pan connector (downstairs toilet/with new flooring).
Old Toilet connected to this lovely. New pan needs an extension.
Got an extendable mcalpine...
Got a full system to cover over in a chased concrete floor all pipes are lagged with hesian sleeves ??
Some areas of piping 20mm from surface of chase. (not ideal i know but no other real option. plus done now ).
Most chases cross open floor and will need to be up to strength.
Been told...
I'd say no corners cut, at least on complete system install. Obviously apart from wrong boiler model.
Maybe on the safety. The only quote that didn't involve hiring a scaffold tower 4 stories up to install flu but instead using a ladder (fair comment). Hence cheap price !!!
Any...
Hello Guys and Girls
My question ;
Will a worcester 24i junior provide a decent shower pressure ??
With good mains pressure. (Shower to be mounted 1metre from boiler and 1+1/2 metres above outlet). in a two bed, one bathroom, medium sized flat.
Background;
Just had a new boiler...