Recent content by parsman

  1. P

    Sistering timber joists effort similar to cost of steel?

    They opened for me. I will share again https://we.tl/t-RiiB1lgk6G
  2. P

    Sistering timber joists effort similar to cost of steel?

    Any thoughts guys? Perhaps the use of flitch beams would make it less labour intensive (cheaper option then steel redesign) for those 4/3 X floor beams, so it would just be 2X timber and reduced risk of warping?
  3. P

    Sistering timber joists effort similar to cost of steel?

    Interesting to see if I get any builders willing to take on such a design....Anyway these are the plans with example photo of what the extension should look like. Can anyone explain why there needs to be 4x timber joined for 2T14 instead of say 2x? would be interested on your thoughts of the...
  4. P

    Sistering timber joists effort similar to cost of steel?

    That was what I was thinking...will do shortly, btw second 20 yrs experienced chippie has the same opinion of swapping over to steel for the ridge beam etc
  5. P

    Sistering timber joists effort similar to cost of steel?

    I have got a quote of 1k + vat for calculating the replacement steels for a SE. I think it will be quiet costly materials wise this route. Current steel cost is about 1.5k but new Steel would probably quadruple or more that amount plus SE cost
  6. P

    Sistering timber joists effort similar to cost of steel?

    Yes. He did mention they use a company that provides a crane service. And I suspect the higher cost of this method falls on me and less grunt work for them
  7. P

    Cracking to 2 yr old rendered wall and parapet coping

    The room with the crack and wet patch
  8. P

    Cracking to 2 yr old rendered wall and parapet coping

    Here are still pictures of the wall and behind the parapet with the visible coping stones. We also noticed this weekend the room that covers the crack area outside also has cracks forming and more concerning damp patch.
  9. P

    Sistering timber joists effort similar to cost of steel?

    He has been doing smaller projects but has taken on more bigger projects recently, a couple of loft extensions, extensions and new basement and I would say his core skill is working with timber! He mentioned that typically timber delivered were never straight and joining 4x would require a lot...
  10. P

    Sistering timber joists effort similar to cost of steel?

    Hi All, We are looking to finally build the water tight shell of our Mansard extension. We had the structural plans drawn up 2 years ago. I had a local builder which I often use look at the structural plan, where steel is minimal, i.e. only proposed for the central section of the floor span ...
  11. P

    Cracking to 2 yr old rendered wall and parapet coping

    Video of behind parapet wall. Which shows a crack between the mortar bed and the wall and not much mortar between the coping stone joints https://vimeo.com/1064243876?share=copy
  12. P

    Cracking to 2 yr old rendered wall and parapet coping

    Here is a video of the wall.... https://vimeo.com/1064171764?share=copy
  13. P

    Cracking to 2 yr old rendered wall and parapet coping

    Hi, We have an extension built 2 years ago, one side is block and sand/cement render. This side now has a deep crack from the top parapet wall down that is very concerning. On inspection of the largest section of the crack and removing by hand that bit. It is wet but the crack does not...
Back