Recent content by pep411

  1. P

    Gas service pipe running through concrete.

    My architect is proposing a lintel and void to avoid concreting over services like a bridge he said...have requested him to get this approved by building control. I am not sure what that exactly means. Has anyone tried above.
  2. P

    Gas service pipe running through concrete.

    I called cadent. They wanted me to book a service enng appointment to assess whether sleeving is an option. I am being told it is not a definitive no, but depends on what enng suggests. I am less worried about lecy. Its gas. I would have relocated but charge looks excessive as I will be cap...
  3. P

    Gas service pipe running through concrete.

    Thank you collectors. Is sleeving this way best option. I had electric cable next to gas. I presume both need individual sleeve.
  4. P

    Gas service pipe running through concrete.

    As I mentioned what is the solution until cut off. I will not be able to wait until Jan when cut off is planned.
  5. P

    Gas service pipe running through concrete.

    I called cadent. I need to call again tmrw.But i want my architect to liaise with them and add specification in his drawings. I am pretty sure someone here must have come across this before.
  6. P

    Gas service pipe running through concrete.

    Builders hand excavated footing to bring property line forward.PP approved. BC plan is to pour concrete 700mm in trench 1m deep. I am waiting for heat pump to be installed in Jan. Order confirmed. I cannot wait for extension to complete after then. What do I do with gas service pipe. Can...
  7. P

    Door relocation objection by BCO

    Will opening a door directly to hallway satisfy point 1.
  8. P

    Door relocation objection by BCO

    This is existing. All windows upstairs approximately 4m from ground have fire escape openings.
  9. P

    Door relocation objection by BCO

    Hi all, BCO has made this comment on re-organisation of extension layout. The stair is shown to discharge into a central hallway and not to a hallway leading directly to a final exit Further clarification is required to demonstrate how means of escape from all areas will be achieved I am...
  10. P

    Timber frame extension 2nd storey with 1m of boundary.

    Yes face is 96cm... so if new extended face is 100cm that might pass. What about guttering...wilk that need to be 1m or guttering can overhang within 1m space.
  11. P

    Timber frame extension 2nd storey with 1m of boundary.

    95cm. So if I make sure timber frame is 100cm from boundary, then no further modifications will be needed. I don't think that's a lot of space to lose. Will, this need design overhaul or just compliance ensuring 100cm gap is maintained.
  12. P

    Timber frame extension 2nd storey with 1m of boundary.

    Will silicon render and fire rated 12.5mm Pink plasterboard inside achieve 30 REI which is what BC might be referring to.
  13. P

    Timber frame extension 2nd storey with 1m of boundary.

    Hi all, Building control have sought this explanation on the following point 1 "The proposed timber framed external wall appears to be within 1m of the boundary. Fire resistance must be demonstrated from both sides: Provide test data to show how this will be achieved". Point 2 "Specification...
  14. P

    Garden room single brick leaf wall

    Hi all, In process of building garden room 8mx 3.75m. Split with stud wall partitioning room and storage. Single brick walls with c24 8x2 timber (20) roof with Osb and epdm. Concrete base foundation. Will have insulation all way around. Large window at back and bifold door at front. Does the...