We had a burglary and they dragged the fridge (yes fridge) over the newly laid engineered oak floor. The scratches seem to be mainly just on the the lacquer (varnish?) and not through to the oak itself. What is the best way to fix this? Someone suggested T cut.
Thanks
Can anyone tell me where I can find a table showing the acceptable values for the resistance of protective bonding conductors when measuring (establishing) their continuity.
Yes an enclosure manufactured by Mitras specifically designed for a "3 phase meter installation" and approved by EDF but rejected by one of their jointers on site. See http://www.meterboxes.co.uk/content/METERBOXESmeterboxes.asp?TypeID=1&CatID=22 box 3rd from bottom IS0040
Has anyone used a meter box for 3 phase and had any problems with the size of the box? I have supplied an approved 3 phase flush mount box but have been told that they refuse to fit the service head as the box is too small.
I agree with electronicsuk.
Going back to KO boxes on noggins, last week I returned to do 2nd fix to find that some of the boxes (that where not plastered over) where moved a little for whatever reason ( i know this for sure as the screws holding the box in place where different from the...
I am thinking of using plasterboard boxes and cutting the openings later. I will make detailed notes of where the cables should be with the hope of them actually still being there. Has anyone tried this method?
When doing 1st fix for a timber frame house I use the noggin with steel back box screwed to it method, but I find that the tackers (plaster boarders) usually do the cutouts really badly or cover over them altogether and plasterers some times fill them in with plaster. Does anyone have the same...