Recent content by romablade

  1. R

    When did building regs come into force for 22mm gas inlets

    I'm in the process of obtaining quotes for a replacement combi boiler. The house is 13 years old (built 1999) and has 4 bedrooms. We currently have an Ideal SE Combi with 15mm gas inlet pipework that disappears into the wall directly behind the boiler. So far, the quotes we have rightly...
  2. R

    Bristan Shower / Salamander Pump Not Working

    Thank mate... Spoke to Bristan and dismantled the shower valve as they suggested. Valve in the hot water elbow completely jammed - needed poke with an allen key to free it. Re-fitted it all and it worked fine for the first three attempts but then stopped again - apparently jammed again...
  3. R

    Bristan Shower / Salamander Pump Not Working

    Thank Warmadmax. The shower head is about a foot from the ceiling, but the pipework feeding the valve is about waist height. The cold water cistern is about 75-80cms above the shower head (not the 100cm that's recommended but the plumber seemed to think that as it was a overly large water tank...
  4. R

    Bristan Shower / Salamander Pump Not Working

    Hi, My plumber fitted two new showers - a Bristan Colonial Thermo mixer with a fixed Victorian Can shower head and a Triton Mini Petita Thermo Mixed with a flexible hose fitting. After installation the water pressure, especially on the Bristan was very poor. Our plumber convinced us to...
Back
Top