I have a 'WarmCore' single aluminium door which is catching along the bottom threshold. There is a obvious gap along the top edge, and the rubber seal is catching along the bottom edge. The door looks square in the frame so I don't believe it needs heel/toe. More, that the door as a whole needs...
I'm looking to convert half my garage into a 'habitable' room so will need to meet the regs for insulation. Looking elsewhere here, I can see the following layers are suggested...
From the outside in:
Cladding
25x50mm battens
building paper
9mm wbp ply
100mm studwork
100mm full fill...
All bar one of our downstairs rooms have underfloor heating and I'd like to add it to the one remaining room. It currently has a suspended floor and so possible to in-fill it, insulate, add UFH pipes and screed as per the rest of the downstairs.
The only difficultly is routing the flow/return...
I understand I should allow around 1 day per mm of screed before I go ahead and lay a final floor finish. I wondered though if it's worth gradually turning up the underfloor heating to 'force dry' the screed and speed up the drying time?
Is this a known practice? If so, does it make much...
I'm looking to mount a TV on a plasterboard wall. The 'stud' sat behind it however is only 2" thick before being mounted onto a masonry wall. I'm planning to use heavy duty 100mm screws so will go into the masonry by around 40mm.
Can I simply drill through all 3 layers and use the respective...