Consider putting the concrete down at the bottom, DPM/barrier over this and building up in EPS70, (that's a strength of EPS not thickness), 22mm P5 chipboard flooring.
Or look at Jabcore, which is an EPS that replaces the hardcore, although it does not protect from clay heave. Do you suffer...