Yeah ill take one off your hands ♂️
Im starting to cycle trade and based on what my guy shows it definitely has an edge. You need to be disciplined enough to stick to the system and use proper risk management but man, waiting.for 4 year cycle.lows to show up and swings on the monthly is not...
Finally a sane comment. I think thats the way to do it. Although the first tile will not be sitting on that angle fillet ( first row on the pic attached to ratfer is the first tile row batten) its just to give the eaves tray some support and lift it from horizontal. I dont know how the old...
How about "maybe just dont comment then" if you dont understand. It clearly says im "re-roofing" . And yes, im doing exactly what was there before EXCEPT fitting additional 3in1 eaves trays.... So im supposed to take photos of what it was like before and then fit stuff that didnt exist before so...
I know mate was thinking that but that would just open up a whole new can of worms. 3 sides are 300mm soffits overhang but at the front, there is a bay flush wirh the fascia and there, the over hang is 450mm. Would just be a load more fannying about. The tiles would line up,the gauge and spacing...
Ok so i have progressed slightly. The joist are the same length as the old ones and the fascia is just as thick so the overall length from wall to the front of the fascia is the same as it was previously. The height of the joist on the other hand....they were 120mm which has to be cut to 105mm...
Ok so im re-roofing and doing the soffits and fascias at the same time. If ripped off all the old ones and started by replacing all the rotted rafter legs (feet/noggins??) To fix the new soffits and fascias to..... And herein lies the problem.....
The rafter legs/feet/noggins whatever they are...