Unfortunately the face of our studs are positioned so that the PB sheet meets flush with decorative stone & brick window reveals. Adding a batten layer would bring us out too far. I did post our scenario but no responses yet
What would be the most appropriate reference method for a cable installed in this manner. The image shows a top down cross section. There is a 20mm service void at the back of a 100mm stud wall (80mm PIR).
Is there a better way to install the cable here?
Winter is approaching and our barn conversion is without a boiler installed, and no mains electricity on the horizon, therefore, no way of heating the place. The ground floor screed has been poured, with the UFH pipes (pert-al-pex) filled and under pressure. My concern is the internal room...