Recent content by yodaveg

  1. Y

    To blind for ground slab? (moved from Projects)

    Thanks Vinn, I did think 3 layers of dpm material seemed excessive!
  2. Y

    To blind for ground slab? (moved from Projects)

    Hi, just wondering if any one could help with a question I have. We are part way through our extension project, underfloor heating pipe work to go down this weekend. Originally was going to have dpm, 100mm of subfloor concrete slab, 25mm blinding sand, more dpm, 100mm celotex board, then...
  3. Y

    Vaillant facelift

    When did Vaillant change the look of Ecotec range, I thought it was 2012ish? Just serviced a 637 according to the boiler info the customer had it was fitted 2007. They have just moved in so have inherited the boiler and paperwork. It's the first one I've seen, was quite impressed, the pipe work...
  4. Y

    Kingfisher MF RSL80

    Sorry, posted here by mistake, also posted in Combustion chamber.
  5. Y

    Kingfisher MF RSL80

    Hi Everyone, Just been to see a Kingfisher MF that ends up faulting to lock out 2/3 times a day, unfortunately it was behaving when I got there. I just ran the "s plan" on hot water only and restricted the gate valve on the cylinder to slow the flow down thinking I could mimic a circulation...
  6. Y

    C plan to S plan fully pumped

    Sounds good just lagg it really well, garages get v cold. Do it in plastic for extra protection.
  7. Y

    C plan to S plan fully pumped

    http://www.screwfix.com/p/expansion-vessel-control-kit/92562 http://www.screwfix.com/p/expansion-vessel-mounting-bracket/86194 http://www.screwfix.com/p/expansion-vessel-12ltr/46517 Just to give a rough idea of what it all looks like and some costings.
  8. Y

    C plan to S plan fully pumped

    No worries mr! Most modern boilers detect how much pressure they have in them, this is one of the reasons they are more efficient as water heats up better under pressure. Your boiler doesnt have this so we could run the system with very little pressure so not to put strain on old pipework. If...
  9. Y

    C plan to S plan fully pumped

    1. pressure gauge 2. expanssion vessel 3. pressure relief pipe 4. temporary filling loop 5. auto air vent This way you could get rid of the small F and E tank in the loft. Also the vent pipe could be cut down and have an auto air vent fitted. The cold feed could be turned into cold mains...
  10. Y

    C plan to S plan fully pumped

    Possible pipework, further explanation to follow:
  11. Y

    C plan to S plan fully pumped

    Possible pipework
  12. Pipework

    Pipework

  13. pic

    pic

    pictures
  14. Y

    C plan to S plan fully pumped

    Ive fitted M valves to the returns when you can't get to some of the pipework (tiled, real wood floors). Basically when it looks like your job. If the M valves failed and they were on the flow they would hold the water back from the tank. so little pumping over would occur. I didn't think...
  15. Y

    C plan to S plan fully pumped

    If you move the M valves on to the return pipes this would work as the boiler still has an unrestricted passage from flow to vent. If M valves ever failed the pump would push water into F and E tank at quite a rate. Might be worth upgrading overflow to larger diameter. With this arrangement you...
Back
Top