Thats wrong and cannot be done, should only have 1x cu with the genny plugging into the 16a shore power socket, and 10a radials for the sockets.
The max power is only 16a, less in eu countries so a ring would be pointless
the changeover switch should be wired before the cu with the shore/genny...