If only that were a concept my neighbours landlord on that side understood.
He had cowboys replace the main roof with concrete tiles, the 5m span at the back is sagged like a banana. They smashed the top of the party wall to bits and added dry verge capping screwed into the end of the battens...
Thanks
nope, as far as I can tell the height is that to meet with what would have been the roof ridge on the coal store at the end of the yard. On most of these properties they are long gone.
The stagger between properties is 1.4m, making this wall 3m tall to ground level on my side.
I did...
Hi Ree, the parapet wall is solid brick with clinker infill. A header course is every 5 courses. My extension has its own thermalite block wall with a 5cm cavity between it and the solid one with a DPC tied into the floors DPM.
Thinking that may be the direction I’ll need to go with it, the...
Hi all,
First time poster here.
I’ve recently been carrying out roofwork on my terrace house. Fitted a velux, replaced lead 2cm x 3cm soakers with 14cm x 10cm and cover flashing on the main house abutment wall with a drip bead rendered in immediately above the lead mate line to ensure it’s...