Search results

  1. C

    air testing gas pipe

    Really yes, I wonderd if he was one of few that didn't air test or if it was the norm. Is the reasoning behind it as once the joints taped it may disguise a leak on the final tightness test?
  2. C

    air testing gas pipe

    He says he trusts his soldered joints
  3. C

    air testing gas pipe

    Well im.a plumber gas engineer I work with doesnt. But I no from my viper book. Studying nvq level 3 that you should.
  4. C

    air testing gas pipe

    Di most people air test gas pipes to 0.5 bar before tapeing and or concealing covered pipe work.
  5. C

    Maxium distance for 22mm condenstate

    Thanks can it run say 2.5 meters in 22mm or do longer runs need doing in 32mm?
  6. C

    Maxium distance for 22mm condenstate

    if running a 22mm condensate pipe internally inside is there a maximum distance were you need to take it up to 32mm?
  7. C

    1300 p plus and 600 single rad

    Or is both as good?
  8. C

    1300 p plus and 600 single rad

    Central Heating Pipework Layout by CAESAR32 posted 20 Mar 2016 at 9:16 PM would it be ok piped like that, or would it be best to tee off separately of the main run for each rad?
  9. Central Heating Pipework Layout

    Central Heating Pipework Layout

  10. C

    1300 p plus and 600 single rad

    Will the central heating be ok heating off the main 22mm run and flowing in to the branch of a 15mm tee and splitting both ways with a rad to pick up off both legs of the tee?
  11. C

    1300 p plus and 600 single rad

    IMG_20160311_163628 by CAESAR32 posted 13 Mar 2016 at 8:31 PM Like that but a rad either side of the main run in the same joist section. Suppose I could drop down to a 15mm tee. Flowing in the branch of the tee and splitting off both ways.
  12. IMG_20160311_163628

    IMG_20160311_163628

  13. C

    1300 p plus and 600 single rad

    Centrall Heating by CAESAR32 posted 13 Mar 2016 at 8:16 PMCentrall Heating by CAESAR32 posted 13 Mar 2016 at 8:16 PM this is the lay out I have
  14. Centrall Heating

    Centrall Heating

  15. C

    1300 p plus and 600 single rad

    Will 15mm pipe be ok supplying a 1300 p plus and a 600 single rad. Or should I tee off the main run twice?
  16. C

    micro bore copper

    I am concerned as the rads on the solid walls are dropped in 10mm from 15mm supplying pipes above. Were as the one rad on the stud wall has 15mm pipe dropped down the stud wall and only going to 10mm on the elbow that exits the stud wall.
  17. C

    micro bore copper

    Were as the rest of the rads are on solid walls I have dropped 10mm so can be plaster over. This ok?
  18. C

    micro bore copper

    The first fix is totally in copper
Back
Top