    Over flow drilled above fill valve

    Yes I feel competent to do it. Just wondered the best way as obviously installed wrong. Even thought of just putting a double check on the cold feed to the inlet and putting a part 2 full valve on. As this would protect to fluid cat. 3
  2. X

    Over flow drilled above fill valve

    Wouldn't have to worry about it getting out with it being plastic. Suppose the tank is too
  3. X

    Over flow drilled above fill valve

    Thanks what size drill bit is usually best when drilling the hole for the float valve tail?
  4. X

    Over flow drilled above fill valve

    Test that by filling up with water after fitted?
  5. X

    Over flow drilled above fill valve

    Would there be anything wrong with using a plastic toilet cistern over flow blank? Or is metal better or is it because of the thread sizes being different
  6. X

    Over flow drilled above fill valve

    I also thought about the option of putting a double check valve on the inlet as this is ok to protect against fluid cat. 3.
  7. X

    Over flow drilled above fill valve

    Good Idea would plastic possibly do a similar job?
  8. X

    Over flow drilled above fill valve

    The part 2 float valves don't come with a rubber seal. But I could just use a rubber seal that comes with a day toilet fill valve?
  9. X

    Over flow drilled above fill valve

    Ah but the the over flow hole will be a bigger hole
  10. X

    Over flow drilled above fill valve

    Do you mean may get away with putting the over flow were the fill valve is. And putting the fill valve were the over flow is.
  11. X

    Over flow drilled above fill valve

    The fill valve should just swap ok for another full valve. Was going to take it fully out and put a part 2 valve on it.
  12. X

    Over flow drilled above fill valve

    Thanks I may need to fit a new valve on it as not shutting off fully.
  13. X

    Over flow drilled above fill valve

    Drill a new hole and blank the old hole?
  14. X

    Over flow drilled above fill valve

    Went to a tank were I need to swap the fill valve the over flow is higher then the full valve. I was going to put a part 2 on it but still won't have an air gap. Any one come across one poorly installed before. Thanks
  15. X

    Waterline header tank

    So like half way between the base and the overflow level set the water height at this level?
  16. X

    Waterline header tank

    At what level would you set the water line on a F&E tank. So it doesn't expand above the overflow level. Thanks
  17. X

    Rothenberg pipe benders

    Ok this is the former
  18. X

    Rothenberg pipe benders

    I have a pair of rothenberg 15/22mm pipe benders. There is a few dots on the former. Am trying to figure out what to align with what to do a 90 degree bend. I had the old hilmor ones before. This had a line on the former were to pull the bend with to get a 90. Thanks
  19. X

    Bending partial pass over

    Yes at a guess my first bend was 60/70 degrees