  1. J

    Hot tap instalation

    You are right in thinking there is a possibility of too much load if you connect the tap to either of those FCUs, especially the plinth heater one. If the FCUs are on a ring final circuit (or any other appropriate circuit) you could add another FCU by either spurring off the feed/supply side...
  2. J

    Shed Electrics

    The electricians plan certainly sounds sensible. Although he refers to taking a supply from the main CU it would be better to supply the shed from a switch fuse (also non RCD) as this would provide discrimination from the protective devices presumably to be installed in the shed.
  3. J

    Atag boiler short cycling

    Also if that one is appropriate, should I use any of the fancy speed settings or just stick to the constant speed settings?
  4. J

    Atag boiler short cycling

    I see the bit about 6m head. Are you saying not to get a grundfos one or just not the 50 model? I saw this one on screwfix, only looking at screwfix in particular as I can possibly get it done tomorrow and report back...
  5. J

    Atag boiler short cycling

    Fair enough I will do that, should I go for an exactly equivalent replacement? Also if that doesn't help whats the next thing to look at?
  6. J

    Atag boiler short cycling

    Actually I should mention when I set it to the 2nd or 1st speed settings the motor sometimes makes a buzzing sound as if it is trying to start up but can't, this only happens if it has stopped completely before trying to start, and I will get going eventually. Fastest speed setting does not do...
  7. J

    Atag boiler short cycling

    There was nothing large at least, just little black bits as would probably be expected. Nothing large came out of the ports. Base was clear although a little rusty. It was able to spin fairly freely, and no obvious damage to any parts, but as has been said who knows if it is actually working at...
  8. J

    Atag boiler short cycling

    Just another though, could the pump be undersized? It's a grundfos UPS 15-60 130. Bearing in mind there are 13 rads and a megaflo do you think it's probably correctly sized?
  9. J

    Atag boiler short cycling

    Sorry I forgot to post about that, it didn't look too badly gunged up inside and I tried to give it a clean, hasn't seemed to have any effect though. I should have taken some photos, sorry I didn't think to at the time. I have also now orientated it horizontally, which also has not changed...
  10. J

    Atag boiler short cycling

    Yes it was a new build, they seem reasonably sized based on the room size and insulation and amount of windows, but would only be effective if they actually got up to temp. The kitchen one for instance is a double panel 600x1400mm as the room (approx 5x5m) has a number of floor to ceiling...
  11. J

    Atag boiler short cycling

    Yes the silver screw cap on the pump is pointing upwards, I'll turn it horizontal but it's been this way for 12 years probably. Is there any way to test whether it is working correctly as a new one is rather expensive and I'd rather not go replacing random parts if it's unnecessary? With regards...
  12. J

    Atag boiler short cycling

    Not gonna disagree with that, it was done about 12 years ago when the house was built (although I haven't lived here that long) but obviously nothing can really be done about it without major work.
  13. J

    Atag boiler short cycling

    Makes sense...could powerflushing help? Would love to have underfloor heating downstairs but obviously it's not practical as the floors are already laid and we're not looking to replace them. As you say the microbore lengths do vary massively. I think the longest length is to the largest rad in...
  14. J

    Atag boiler short cycling

    That's thanks to my house being a new build:rolleyes:. I don't know why they decided to shove it all in such a small area, they've basically put the hot water cylinder on top of a shelf and the pipework shown is underneath this. I'll check the torque as you describe.
  15. J

    Atag boiler short cycling

    I have opened the upstairs trvs up to about one full turn and kept the temp set at 70, this makes no difference and the boiler still only runs for a minute or so. With the lockshields open about 2 turns, it's still no better. With the trvs all open as well it works much better, will run for 5+...
  16. J

    Atag boiler short cycling

    So I've had a play around this morning. With all trvs and lockshields fully open it seems to run for longer,but still quite a big difference between flow and return temps when the boiler cuts out. I turned the temp down to 70⁰c, and balanced the system by opening all the upstairs lockshields by...
  17. J

    Atag boiler short cycling

    That's what I though, I'll have another play around tomorrow. Could be a dodgy switch, which could mean it's actually only running at the first speed setting? But it is running when it should be.
  18. J

    Atag boiler short cycling

    It's set to maximum speed (3rd speed setting) and always has been as far as I'm aware. Just out of interest I tried turning it down the the second setting and it just goes off completely, not sure if that should be happening.
  19. J

    Atag boiler short cycling

    I could probably approximate most radiators to be an average of 600x600mm single panel with two much larger double panel radiators in the kitchen and living room. The pump always seems to be running when the boiler fires up so in theory the heated water should be drawn away - whether or not this...
  20. J

    Atag boiler short cycling

    Would you expect the return temp to be similar to the flow temp at the point the boiler turns off?