Search results

  1. C

    When parquet starts to get out of square...

    Take it up and Rennovation Coat self levelling screed the ply for a flatter, less undulating subfloor then refit.
  2. C

    Thermoplastic tiles on cracked and damaged concrete floor 1957 bungalow

    For laying carpet, a DPM is a bit OTT. However if you do DPM sandwich, just glue the gripper and door bars with Flexy-Fix and it will be hard enough to stretch to in an hour or less.
  3. C

    Engineered Wood flooring over joists

    Engineered wood flooring is not a Structural floor, you would need floorboards/Composition boarding over the joists before the Engineered Wood could be installed as a 'finishing' floor surface.
  4. C

    Carpet joining tiles, carpet too short

    If you try and kick that back into the bar, use plenty of spray contact adhesive first to glue the underlay to the floor and to help the carpet grip the top of the underlay. Or use a wider profile, perhaps a piece of scrap oak, or you can buy a profile from Treadplates UK to butt against the...
  5. C

    Stair Case exterior touch up

    If you have the skills to face the exposed area with thin boarding/mdf etc you could then fill and paint which may be easier than trying to sand and fill the area as it is at present?
  6. C

    Solid wood over floorboards

    There’s is no point in screwing, just use the right glue and save yourself a whole load of time.
  7. C

    Bathroom Underfloor Heating Query (Vinyl)

    The UFH product will specify what the manufacturer recommends but in short the vinyl will need a stable firm surface, nothing spongy etc.
  8. C

    Solid wood over floorboards

    You cant install Solid wood with an Underlay. You should only install an underlay if you are floating a Engineered Wood, Laminate or LVP floor. The correct way to install this will be to 6mm SP101 Ply the floorboards and glue the solid wood to the Ply with wood floor adhesive. You'll only be...
  9. C

    Bathroom Underfloor Heating Query (Vinyl)

    The vinyl will need to be 10mm above the UFH mat. How you enclose the mat will depends on the specs of the UFH If you are retaining the traditional heating in the space, vinyl is quite warm to the touch etc, I'm not so sure you'll see much benefit in such a small space, it will also cause...
  10. C

    Laying a floor on my own - First time - What type of Plywood is best to lay/Adhesive question?

    I'd lift the old carpet etc, thoroughly bleach the floor and let it air, and if the tiles are good/flat, lay the sheet vinyl direct for now, use spray adhesive to perimeter fix. This should be fine until you choose to replace the whole lot in the future. If you can get a particular Sheet vinyl...
  11. C

    LVT Prep - Ply Over Hardboard?

    You'll need 6mm Flooring Grade SP101 Ply , fix with ring shanks and then feather all the joints and heads. Then glue the LVT on-top. If you are laying the LVT Herringbone, we would Mapei Renovation 3mm Coat Screed over the ply instead of feather.
  12. C

    8mm Laminate on OSB Over Berber — Genius Hack or Disaster Waiting?

    It will be laid on a spongy carpet and not be attached to anything, of course it will move and amplify movement of the laminate.
  13. C

    8mm Laminate on OSB Over Berber — Genius Hack or Disaster Waiting?

    Yes, that’s how they are designed, they have expansion gap all round the outside, however, your proposal will cause the floor to flex up and down and expand/move across and around the space
  14. C

    8mm Laminate on OSB Over Berber — Genius Hack or Disaster Waiting?

    The OSB will move on the carpet, the Laminate will move on the Underlay, together they’ll move twice as much at least than if the Laminate was fitted correctly. Not only will it bounce, it will move all over the room as it’s a floating floor.
  15. C

    8mm Laminate on OSB Over Berber — Genius Hack or Disaster Waiting?

    The whole thing will wobble like a jelly.
  16. C

    8mm Laminate on OSB Over Berber — Genius Hack or Disaster Waiting?

    How were you planning on fixing the OSB down?
  17. C

    Levelling floor before laying vinyl flooring

    30+ Years in the professional flooring trade, but what would I know right?
  18. C

    Levelling floor before laying vinyl flooring

    You’ll need a screed coat to level the floor and dip over the crack bridge to take the worst of the dip out and of course the gap between the conduit and the concrete, when this dried, it will sink/dip/slump in these areas, then you’ll want a final coat screed to actually level the whole floor...
  19. C

    Repair vinyl floor tile

    They are knackered, see if you can get a remnant piece of vinyl, preferably with a felt backing and lay it over the top.
Back
Top