Search results

  1. M

    New busbar for split-load consumer unit converted to all RCBO

    Good God is this still going on
  2. M

    New busbar for split-load consumer unit converted to all RCBO

    And yet everybody is still going on about it
  3. M

    New busbar for split-load consumer unit converted to all RCBO

    "Trolling is such a childish pastime".........,and so is being pedantic.........which happens a lot
  4. M

    New busbar for split-load consumer unit converted to all RCBO

    And you do actually pick up some good advice
  5. M

    New busbar for split-load consumer unit converted to all RCBO

    No......love watching everyone on here going at it
  6. M

    New busbar for split-load consumer unit converted to all RCBO

    Not really my intention, but I knew it would happen
  7. M

    new standards from 1/4/2024

    Oh Dear!
  8. M

    New busbar for split-load consumer unit converted to all RCBO

    So, was he qualified or COMPETENT to do the job?....Gave up following the thread after he nearly burst out crying
  9. M

    New busbar for split-load consumer unit converted to all RCBO

    Oooooh he does quote the regs
  10. M

    New busbar for split-load consumer unit converted to all RCBO

    Get a new consumer unit..and are you qualified to be doing this
  11. M

    Ip65 downlighting replacement

    Where is the cover that fits over the cables and connector block, and if you find new bezels make sure you re terminate them, there should be no single insulated cable ( brown,blue and cpc ) showing outside of that enclosure
  12. M

    IKEA light fitting, no space for earth wire?

    i refuse to fit them now.....ballache
  13. M

    Consumer unit change - needs isolator fitting?

    SSE Always tell me its fine for me to pull main fuse
  14. M

    Outside double socket install DIY question

    Addition to a circuit....Upgrade RCD if needed ....Test and issue a MWEIC
  15. M

    Outside double socket install DIY question

    New circuit....RCD will need upgrading if its a type AC...EIC will need to be issued..And building control will need to be Notified Get a Sparky
  16. M

    2 gang switch backbox

    The one that the sparks provide
  17. M

    Is this work notifiable under Part P

    Its an addition to a circuit so a minor works cert should be done also the RCD protecting the circuit should be upgraded to a Type A
  18. M

    Suggestions for home made Downlight Covers?

    No..most led's are made for that now......check the specs
  19. M

    Suggestions for home made Downlight Covers?

    What sort of led downlights have you fitted that need a cover
  20. M

    Metal Double Socket - replaced but safe?

    Did you check to make sure you had a good earth to start with...if yes and you have run a fly lead to the faceplate then all is good.....also is it rcd protected?
Back
Top