Search results

  1. T

    Cutting door threshold into concrete step?

    Would love to, but ground level outside is flush with top of the concrete, and it's a big step down to get inside... I'd basically have to replace at same height so reckon I'd just be making work for myself.....
  2. T

    Cutting door threshold into concrete step?

    Door opens inwards...
  3. T

    Cutting door threshold into concrete step?

    I need to replace and old wooden door and frame with something insulated and watertight.. Problem is, I don't have much height - lintel is only 1820 above step.. I'm thinking to cut the new door threshold into the step.... Folly? Any other solutions? Can't lift lintel as there are floor...
  4. T

    15mm copper to 16mm PEX compression fittngs

    Does a 15mm to half inch compression fitting do the same job? Thanks
  5. T

    How to create overhang over garage doors when running posi joists across walls?

    Walls are to be 6*2 timber studs, noggins and metal strap bracing... So yes, likely clad with vertical gravel boards, with battens over joins... So total cladding depth approx 50mm....
  6. T

    How to create overhang over garage doors when running posi joists across walls?

    So OK with front overhang detail. Now thinking about fascias... How much will roof need to be past wall to allow for cladding and fascia?
  7. T

    How to create overhang over garage doors when running posi joists across walls?

    Precisely what posi joist supplier has suggested
  8. T

    Setting shower drain before laying floor

    Just to revisit this.... So you bed your waste into the screed?
  9. T

    How to create overhang over garage doors when running posi joists across walls?

    Agreed re 30mm of insulation, pointless. I won't be doing the tapered insulation.
  10. T

    How to create overhang over garage doors when running posi joists across walls?

    I appreciate your points here.... It would certainly be easier to create the fall with the actual joists... But.... when have you ever set something out of level or plumb and not regretted it later?? Yes, could level out ceiling later, but I'd not enjoy it!
  11. T

    How to create overhang over garage doors when running posi joists across walls?

    Hah. Good plan. Though I suppose furrings run perpendicular to the joists would do same thing, but look rubbish from the underside.....
  12. T

    How to create overhang over garage doors when running posi joists across walls?

    Right! Quote in for the tapered insulation..... Over 2 k for 36 square metres of tapered insulation... And that would be tapering from 130 at the high end to just 30mm... So, scrap that idea.... I can get furring strips to create the fall from 200mm to nothing for about 500 quid, or cut them...
  13. T

    Ewi Silicone Paint Premium Bio (EWI-006)

    I went for Beeck Silicate. Eye wateringly expensive, but gone on well
  14. T

    How to create overhang over garage doors when running posi joists across walls?

    I'm planning on using 6m long posi joists across the walls to create roof structure on a double garage... It's to have a flat roof, with slope created from tapered pir. Any ideas as to how to form an overhang over door? Other than literally hanging a bit of frame work off the deck? I can't...
  15. T

    Setting shower drain before laying floor

    How is it best to set a shower drain before pouring a screed? I thought I'd perhaps build a wooden support for the tray at correct level and location, then set drain pipe with some muck.... But, is there a better way?
  16. T

    Shower tray with proper raised sides

    Any reccomendations for a shower tray that ISN'T low profile? I want one with proper raised sides!
  17. T

    Orange water after changing to unvented cylinder

    Well maybe it was the increased pressure, maybe it was the Flux... But either way it cleared within a couple of days....
Back
Top