Thanks for the reply. Yes I got setback 300mm for first floor, but still didn’t understand why steel is needed at roof level. I will ask again my structural designer. Attaching ground and level 1 drawings. I haven’t installed level 2 steel yet. But level 1 is done.
Hi All,
I got a question, can someone help?
My house is semi and extending to 2 storey.
From the stairs I’ll go up and from landing if I turn left and one step climb I’ll go to existing rooms. If turn right I’ll go to new rooms. I would like to know what is the building reg minimum...
Hi All,
Can somebody help me?
I am doing an extension rear single storey, side double storey 7.6X3.5m front single storey on a semi.
My question is about a double-storey wall.
On left side I got an old wall (existing)
backside steel sitting on the goalpost, first floor wall I can build on...