Search results

  1. K

    Vaillant ecotec plus cycling on HW only demand

    don't think I can help much then. if on a VR you can set hot water part load in D.77 to range rate to suit the cylinder coil but I don't think it works with standard controls but still worth a try I usually set it to 12Kw (factory set at 30Kw)
  2. K

    S plan heating with cm927

    http://www.diyfaq.org.uk/docs/Sundial-Wiring-Rev1d-2nd%20Edition.pdf try this link - page 5
  3. K

    S plan heating with cm927

    its simply wire from timer heating on goes to number 4 terminal wire from number 4 terminal goes to common on room stat wire from room stat goes to 5 wire from 5 goes to heating zone valve brown permanent live from term 1 feeds the white wires on both valves orange wires from both...
  4. K

    Boiler timer settings for Megaflo

    about half an hour ahead of your required usage times should be best
  5. K

    BEKO BA51NE PROBLEM WITH GAS DISTRIBUTION WITHIN THE COOKER

    i admire your faith in Beko!! :lol: :lol:
  6. K

    Vaillant ecotec plus cycling on HW only demand

    is the boiler wired up via a standard wiring centre or a Vaillant VR61/65?
  7. K

    Grommet required in pre-made hole in backbox?

    i just cut the grommet to fit :lol:
  8. K

    £1000-£1500 for supply and fitting (Soton Area) best combi?

    been doing it a long time and rarely do i need to see a job to know what the basic price will be. price is always a big factor for anyone including the installer!! the customer wants value for money but it cannot be at the installers expense he has to make a living as well!! at the end of the...
  9. K

    £1000-£1500 for supply and fitting (Soton Area) best combi?

    thanks DIA even i wouldn't go that low!! i'd start at around £1900 for a 28kw potterton combi, a vaillant 831 for around £2.1k, an 837 £2.3k
  10. K

    Shaver Socket

    no most i see have a toothbrush plugged in!!
  11. K

    Choice of 2 drills

    just got the makita 18v from B&Q not a bad tool!
  12. K

    Need a PIR check done - worried about discruption

    unlikely to have disruption during the check itself, its the retification work necessary that weill involve mess! PIR is now old hat what you need is a EICR electrical installation condition report
  13. K

    MCB tripping after new shower installed

    suggest the fitter is not competent to have done the work!!
  14. K

    FAO ecowarrior etc. How did I do?

    thanks!! it was but its been hijacked :lol: :lol:
  15. K

    Ferroli 102 "lock out"

    kick start version!! :lol: :lol:
  16. K

    Ferroli 102 "lock out"

    sorry my bad typing!! thermistors x 2 are located in the lower section behind the control panel/pcb they are wet pocket type, so to do anything other than swap the wires over, will mean the water will need to be turned off at the inlet (blue tap on 4th pipe from left) and the heating...
  17. K

    Ferroli 102 "lock out"

    depends on the 102 you have, the modena 102 suffers from issues with the thermistors, over heat sensor and the venturi thermistors can be swapped round to check overheat can be taken off pipe to check and the venturi is simplest to just change BUT last 2 ARE IN COMBUSTION CHAMBER SO RGI NEEDED.
  18. K

    Continuity Assistance - Lighting Circuit with readings!

    @dizz, yes i've had a few issues with those double sockets and now don't buy them. buy from TLC now as although still cheap switches are slightly better quality and their cable is cheaper too!
  19. K

    vaillant ebus control wiring 230v & 24v

    i always run ebus and 240 together from boiler to switch on wall in a 5 core then seperate from there to stat/time etc never had an issue with it
  20. K

    Domestic Bonding Gas & water

    i know that :lol: just prentice made the statement that they had to be close to each other which i what i questioned
Back