Search results

  1. P

    pile foundations

    anyone know of pile foundation engineers in the north east need 8 piles on a 6.5mX3.5m 2 story extension? any info appriciated cheers steve already got a quote from roger bullivant
  2. P

    ideal classic ff240 fireing up for 20 seconds only

    you are all stars many thanks for your response bled valve next to cylinder loads of air and i bled ch pump hot water working fine haven"t tried heating yet.will keep you all posted again many thanks peasie
  3. P

    ideal classic ff240 fireing up for 20 seconds only

    hi yes i did get water out of upstairs rads when bled but i didn't change setting to manual when i turned on the main water supply really just turned it back on without doing anything
  4. P

    ideal classic ff240 fireing up for 20 seconds only

    no i have not bled anything other than the radiators.how do i bleed this thanks
  5. P

    ideal classic ff240 fireing up for 20 seconds only

    replaced bathroom rad yesterday and had to drain the system from the valves in the bathroom to cut and shorten pipes now my boiler will start up then turns off after about 20 seconds.has my boiler got an air lock? the reset button on the side is solid so i don't know if its in the normal...
  6. P

    RETAINING WALL 2mX10m

    yes i think your right a wall over 1.2m high has to have a structual report the wall is drawn on the plans aswell so i think i will have to speak to them thanks
  7. P

    RETAINING WALL 2mX10m

    Hi everyone really after some advice i have been given planning permission for my side extension and need to move the current retaining wall which is 1.5m X 10M long and is constructed with a double course brick further back about 4.5m to make the new wall 2m X 10m is it possible to dig out all...
Back
Top