Search results

  1. D

    WUFH, Cracks in the screed

    Tony, I agree the plumber seems to be that way. There is only the one crack, and it's where the second floor screed was poured, so that and the minor back filling over the screed board filling that have lifted seems to be the only real issues, but I've the architect coming out tomorrow so its...
  2. D

    WUFH, Cracks in the screed

    Hi Tony, No the boiler output was connected to a 2port Reliance Manifold with Reliance mixing valve, the mixing valve was left at MAX which is over 55degC, the flow valves were left fully open too. Not sure how the pipes were arranged, we have 2 zones. The screed boards were probably 50mil if I...
  3. D

    WUFH, Cracks in the screed

    Hi thanks for replies. Newboy, the channels are where wooden screed boards were removed, he back filled them, his screed tool was only 3m wide! Dan, I should add there are no controls ie. Thermostats, valves wired up thats down to someone else. when I came downstairs at 2.00 the flippin floor...
  4. D

    WUFH, Cracks in the screed

    Hi, I have a new extension built, made wind and water tight end of November. The Plumbers installed pipes on the insulation using plastic 'egg box forms to hold the pipes. 100mm screed was laid on top and I was told it would be 4-5 weeks before the heating could be turned on, which meant the...
Back
Top