Search results

  1. M

    New workshop

    Workshop has 2x DBs (DB3 & 4) fed from DB1 Main DB in House. Workshop DB3 (Fed from DB1, C50A MCB, 10mm supply cable): C40A MCB= DB4 supply C16A MCB= Workshop AC B16A MCB= General Power (1x DSO, 1x FCU for floodlight, 1x SSO for alarm & 1x FCU for AC condense pump) B16A MCB= Freezer B16A RCBO=...
  2. DB1 Main DB

    DB1 Main DB

  3. Contactors box finishedand labeled

    Contactors box finishedand labeled

  4. DB4 finishedand labeled

    DB4 finishedand labeled

  5. Contactors wired

    Contactors wired

  6. DB4 wired

    DB4 wired

  7. IMAG0210

    IMAG0210

  8. Fixing up trunking

    Fixing up trunking

  9. M

    New workshop

    walls finished and electrics going in (About 260 blocks were used for the walls) Walls finished and electrics going in by mdbalson posted 18 Sep 2017 at 6:16 PM IMAG0217 by mdbalson posted 18 Sep 2017 at 6:17 PM Door frame and step going in Door frame and step going in by mdbalson posted 18 Sep...
  10. Door frame and step going in

    Door frame and step going in

  11. IMAG0217

    IMAG0217

  12. Walls finished and electrics going in

    Walls finished and electrics going in

  13. M

    New workshop

    For storage and general DIY work at the moment. There will be by the workbench about 4x double sockets, 1x 16A Ceeform & 1x 32A Ceeform via a RCD DB fed via a contactor with EM stops to switch off supply to workbench sockets.
  14. M

    New workshop

    Roof nearly done, then finish walls up to roof Roof by mdbalson posted 1 Sep 2017 at 1:01 PM Roof by mdbalson posted 1 Sep 2017 at 1:03 PM Roof by mdbalson posted 1 Sep 2017 at 1:04 PM
  15. Roof

    Roof

  16. Roof

    Roof

  17. Roof

    Roof

  18. M

    New workshop

    Walls up, starting roof Walls up starting roof by mdbalson posted 23 Aug 2017 at 1:22 AM Walls up starting roof by mdbalson posted 23 Aug 2017 at 1:23 AM
  19. Walls up starting roof

    Walls up starting roof

  20. Walls up starting roof

    Walls up starting roof

Back
Top