Search results

  1. T

    Tiling a newly plasterd wall

    I've read the sticky has been very useful. I have one more question I will be tiling with a full tile on top of the bath then a tiling baton around the other wall. What is the best way of tiling down to the floor after I have removed the baton? Do I work out the cut then tile up from the floor...
  2. T

    Tiling a newly plasterd wall

    Thanks very much for the advice. Yes I'd probably of been tricked by the plaster turining clear after a couple of days I'll wait 7 days at least. I'll read the tiling info you suggest aswell. You say with the central heating on but not in the room were there plaster is drying why is this?
  3. T

    Tiling a newly plasterd wall

    Its just a skim coat on to the old plaster which is firm. So you saying 10/14 days so it need to be totally dryed out, very light pink/ clear colour before I tile?
  4. T

    Tiling a newly plasterd wall

    Hey how long after a wall has been plaseterd is it usualy dry enough and ok to tile on to? Wasn't sure wheather to put this in the tiling or plastering forum. Thanks for any advice
Back
Top