Thanks Celeronmanuk, I guess this is the key:
A mortar bed is applied to the sanded strip. The
slates or tiles are fixed on both sides, ensuring
they are located and butted up centrally over the
bonding gutter. Ensure the mortar does not enter
the water channel of the slate or tile.