sorry forgot to mentioned that the floor will be tiled, another 20mm (tiles and adhesive) will be added. therefore, the skirting board will be above the the tiles and the cable will be below the lowest point of the skiting board by at least 10mm. Hence, even if someone drill onto the lowest...