Search results

  1. R

    Cable Tracker with Tone Generator

    Lights out of sequence (e.g. 1-2-3-4-5-6-7-8 on one side and 1-2-4-3-5-6-7-8 on the other) means swapped wires. Two or more lights on at the same time means two wires shorted together, missing light is wire open (not at all).
  2. R

    Cable Tracker with Tone Generator

    Usually because you want to identify a circuit without turning anything off (connect the sender to a socket and run the receiver along the MCBs in the DB).
  3. R

    Cable Tracker with Tone Generator

    These testers clip onto a cable and basically turn it into an aerial. You can pick up an audible signal when you get the receiver to within 50 mm or so of the cable. Great for tracing unknown cables in walls. This one looks like my Testboy 26 in a different case. It’s great but it does have one...
  4. R

    Blocking off an unused 13 amp double socket

    I do know a kid that at the tender age of four somehow managed to wedge a pair of scissors into a 13 A socket deep enough to get a shock. No idea how but it happened.
  5. R

    What is the best way to wire this connection box?

    Can‘t imagine it would make any difference whatsoever. You‘ll probably need junction boxes with more than three terminals once lights are involved though, things like switched lives and strappers.
  6. R

    What bulbs are what, and how to tell?

    I had to replace 60 W incandescent bulbs in my lounge every year (facing north, so I have to turn the light on fairly early in winter). They were guaranteed 1000 hours, which is an average of less than three hours per day.
  7. R

    Is this suitable for an electric car charger?

    It means that the neutral is switched but has no overcurrent sensing.
  8. R

    changing to electric cooker, is my 1980 wiring okay?

    Suspiciously looks like the RCD only protects one circuit, probably for the conservatory. I don‘t think there’s any legal requirement to update the CU when connecting a new cooker to the existing fixed wiring but personally I‘d recommend replacing the CU anyway. It’s most likely still as safe as...
  9. R

    Is this main breaker box and subpanel setup correct?

    I think we need to keep track of separate issues here. TN-C-S only means that a PEN conductor runs from the DNO transformer to the consumer‘s premises. This PEN is earthed at the transformer and often also along the way (PME). At some point the PEN is split into N and earth conductors. This can...
  10. R

    Bathroom light has 9 wires

    The L2 terminal on the old light was essentially a spare not connected to the light itself so you need another connector for these wires. All the other connections are identical.
  11. R

    Is this main breaker box and subpanel setup correct?

    The US are 100% TN-C-S. Some areas split the PEN at the meter and run neutral and earth to the main distribution board but most run the PEN (referred to as neutral and coloured white) all the way to the main DB, which has a factory link between the neutral and earth bus bars. If used as a...
  12. R

    Is this main breaker box and subpanel setup correct?

    Usually if the supply is a TN there’s pretty clear rules if and where the neutral is to be connected to the earth in the customer‘s house and how the PEN is to be divided into neutral and earth. These can vary even within one country. If it’s a TT supply, there’s no connection between neutral...
  13. R

    Curcuit tripping after connecting to plug socket

    Swapped neutral and earth? Fixing the socket to a metal back box could easily cause an RCD trip then.
  14. R

    Is this main breaker box and subpanel setup correct?

    These Legrand MCBs have shrouded terminals. Check if the 63 A disconnects all power to the house. If it does you can safely remove the front cover and have a look at the wires.
  15. R

    Connecting replacement cable, for hob circuit, into old Consumer Unit with shared RCD - 'legal' (within regulations) or not; notifiable or not?

    I‘d argue if the cable takes the same route, serves the same load and is connected to the same MCB as the old one, it’s a repair/like for like replacement rather than a new circuit. Besides, you clearly aren‘t adding a circuit, the MCBs in your CU stay exactly the same. That means it’s not a...
  16. R

    Connecting replacement cable, for hob circuit, into old Consumer Unit with shared RCD - 'legal' (within regulations) or not; notifiable or not?

    As far as I know, RCDs covering multiple circuits are frowned upon by many electricians but still perfectly compliant even in a new build.
  17. R

    Light switch trapped wire

    Heatshrink is definitely an acceptable repair, tape is debatable but will work.
  18. R

    A Blast From The Past

    My parents had a whole medical office fitted out with 12 V halogen lights in 1987, three 400 VA transformers. All the light switches are on the secondary side, no fuses anywhere to be seen. The choc blocks between the 2.5 cables from the transformer and the leads on the lights kept melting and...
  19. R

    Help with 4 colour wiring

    This is also one of the rare occasions where neon screwdrivers come in handy. Touch the screwdriver to both terminals with the switch on and off. The one that lights up the screwdriver when the switch is on is the switched live.
  20. R

    Installing single gang in double knockout box

    Looks like the panel is designed for continental back boxes with 60 mm fixing centres and 71 mm gang spacing. The bracket shown above should work though.
Back
Top