Search results

  1. P

    Baxi WM 70/4PF

    You want to hope it's not the control board as they aren't the cheapest bit of kit to buy and get fitted.
  2. P

    JG Speedfit for combi systems

    They will be fine, just don't put them within 3 metres of the boiler on the heating flow/return pipework.
  3. P

    I may need an additional CH pump

    What make and size pump do you currently have at the moment.
  4. P

    New (old) house, broken heating system

    By the looks of things you have pumped heating and gravity hot water if there are no motorised valves If you replaced the cylinder and changed it all to fully pumped the chances are it could fix your problems. Power flushing microbore is a bit hit and miss, some people say its pointless...
  5. P

    Notifying Gas Safe of boiler install

    Contact gas safe and let them know.
  6. P

    Soldering

    Don't forget though does your insurance cover you for water damage, if you start doing plumbing work you will need to make sure your insurance covers you.
  7. P

    Radiator Positions

    I would say the same as above, if not I would of thought they may get a bit nippy when the weather turns cold.
  8. P

    WORRIED ABOUT BOILER BEING CONDEMNED!

    I would be more worries about the fact you let an electrician move your boiler. Did he do the gas pipe and flue alterations himself???
  9. P

    How much should it cost to commission a Combi Boiler?

    £120 is dirt cheap, I would want at least double that.
  10. P

    How much should it cost to commission a Combi Boiler?

    Just because all it needs is a couple of bends on the gas doesn't mean its a simple job. It will need a visual inspection of everything before anything starts, then turning on, commissioning, filling out all the necessary paperwork, making sure it all runs right, balancing the heating system...
  11. P

    Can a flue take two 90 degree turns?

    Elbows are normally worth a metre of flue 45 degree bends are half a metre. Get your gas engineer over and he will be able to figure out if it can be done.
  12. P

    Replacement Boiler

    There's no point putting a combi in at all if the flow rate is that low
  13. P

    Replacement Boiler

    You size a combi on the hot water demand not the heating. Go for at least a 30 kw boiler if not bigger
  14. P

    Seal the gap between bath and tile!

    As above will be fine
  15. P

    Re grouting cost

    Was just wondering if anyone has a rough Idea of what it costs to get some bathroom floor tiling re grouted, cheers
  16. P

    Expanding foam

    Will be absolutely fine mate, if not every new build these days will be in a bad way soon as they use it to seal around everything.
  17. P

    Converting to sealed system vessel location

    The vessel will have its own discharge on it so where ever you put the vessel you need to take into consideration a discharge pipe.
  18. P

    Gas pipes in concrete

    Are you sure it's rapped in yellow tape and not coated in yellow plastic straight from the factory.
  19. P

    Gas pipes in concrete

    Aslong as the pipes are covered on something then they will be fine.
  20. P

    Window in shower area

    I've seen it before, aslong as it is all sealed up properly it should be fine
Back
Top