Search results

  1. R

    Bonding Q

    probaly 6mm On EICR is does say it's 6mm and no comment about being undersize, or needing upgrading As advised here 10mm is required I'll get that upgraded to 10mm.
  2. R

    Bonding Q

    Interesting that there was a full EICC test & certificate last month, no mention of any bonding issue.
  3. R

    Bonding Q

    There were 2 pictures attached to the certificate - one entitled 'gas test' showing manometer, the other pic of the top of the boiler entitled 'as left'
  4. R

    Bonding Q

    What size conductor is required ? As you say may now need to be larger, I can check when I visit.
  5. R

    Bonding Q

    He just put a comment in the 'Landlord Gas Safety Record' that boding conductor is insuffienct size .... and a photo of erath bonding wire ion boiler. As I understood (and confirmed above as gas is primary bonded at the meter (within 600 mm of entry) there is no need for this bonding at...
  6. R

    Bonding Q

    Landlord Gas Safety Record
  7. R

    Bonding Q

    On my house I had boiler with earth bonding to gas pipe at boiler. When boiler was replaced, the GasSafe fitter removed bonding cable advising regs no longer requires this as copper gas pipe provides the earth. OK …. I thought odd, but they signed off safety so I accepted it. On a rental...
  8. R

    Folding shelf extension

    It is used outdoors but not left there, kept indoors with a cover over it. Any thoughts on opt 2 or 3 I can finish wood with Tung oil for a working finish.
  9. R

    Folding shelf extension

    I came across a neat addition a guy had done to a folding shelf on a Smoker. This as standard has a small folding shelf – too small to be much use. I don’t want to go quite that big …. 30” x 12” would suit my smoker. In the post the guy mentions he nipped into Bunnings and picked up hardwood...
  10. R

    Hot Knife spare part

    Update … I used this switch and bent the lever to match. Repaired & working again. I’m guessing the very high current on secondary, creates a huge back emf when you release actuating button. This maybe why switch failed. Thank you.
  11. R

    Hot Knife spare part

    Certainly look possible …do you know if mounting holes are standard diameter & spacing. If not I can try asking seller. Thank you
  12. R

    Hot Knife spare part

    Yep it’s u/s, normally closed is working, but normally open no action. … assuming this has a modified lever, a straight lever would do and I’ll modify. I have been looking on eBay, but not found one with contacts in right orientation yet.
  13. R

    Hot Knife spare part

    I have a ZTA Thermo Schneider 20 used for cutting plastics. (pic attached) The operating lever operates a lever Microswitch ... CHERRY model G62 250V 10A (pic attached) Does anybody know where I could get a replacement. Or if there is a CHERRY main dealer in UK
  14. R

    Solar Generation issue

    Solar Edge have approved RMA and new one on its way. I am quite happy to swap it over as I can isolate both sides. Asked about configuration ..... they said I can call in and they will talk me through config ..... pretty easy to do.
  15. R

    Solar Generation issue

    I’ll wait for replacement, physically hook it up, but keep add & AC isolators open. I’ll contact SolarEdge to see if they can talk me through set up. If not will have to find local installer. I guess many are in same issue, loads of companies folded after the Government FIT changed to 3rd tranche.
  16. R

    Solar Generation issue

    Is there a good UK Solar PV forum ? ..... need to ask some more questions and appreciate this sub-forum may not be the most appropriate. If they do indeed send me a replacement Inverter, swapping it over will be easy enough, as Panels come in (via isolator to a pair of plugs. Outputs will...
  17. R

    Solar Generation issue

    I have an account to 'view' the sales pitch was 24x7 active monitoring, but as they no longer exist,... screwed on that. Just been trying to check on Ticket to get message "contact the monitoring company for my system" There isn't one.
  18. R

    Solar Generation issue

    I have logged ticket with them, and they confirm the inverter is dead (so they can connect to it) .... but no monitoring it seems. They advise they are going to send me a new Inverter under RMA, so that side of things sounds positive.
  19. R

    Solar Generation issue

    Wasn’t sure which sub-forum, hope this suits. I have a Solar panel array on my roof, connected to a Solar Edge inverter, this can be accessed via a phone app to view generation stats etc When this was sold, one pushed benefit was that there was active monitoring, and if a fault should happen...
  20. R

    Tripod & Bipod

    asked to provide a picture ... there is the fixing screw, and the locating pin
Back
Top